McCormick Place West Expansion

McCormick Pier and Exposition Authority
McCormick Place West
Dates: 2001 – 2004
Cost: $850 million

Project Detail

The new McCormick Place West Expansion project will be implemented as a design-build project, with dsi serving as part of the team that is assisting McCormick Pier and Exposition Authority staff by providing technical assistance and support throughout the construction.

dsi was responsible for project controls and scheduling for the new expansion. In this capacity, dsi implements integrated project management control systems tailored to MPEA requirements; assists in contract administration; provides project status reporting and creates and maintains the master schedule, detailed CPM project schedules, and cost and resources loads; analyzes/reviews design/build contractor’s proposed changes for schedule impacts.